Wrexham School

A brand new school has just been completed in North Wales to accommodate 220 children, from nursery age groups through to year six. Energy from the warm ground is absorbed in the mixture and translated to two inter-connected NIBE Fighter 1330 Heat Pumps situated in the school's boiler/utilities room.

Project:

Wrexham School

Heat pump installed:

NIBE F 1330

 


 

Image: About Us/Projects/Wrexham School

A brand new school has just been completed in North Wales to accommodate 220 children, from nursery age groups through to year six.

Energy from the warm ground is absorbed in the mixture and translated to two inter-connected NIBE Fighter 1330 Heat Pumps situated in the school's boiler/utilities room.

These pumps, with a capacity of 30kW, convert latent energy into heat for the water in a fully insulated tank situated near the Fighter units. This in turn, feeds the entire under-floor central heating system and the hot water supply for all the school buildings.